NOTICE TO NAVIGATION INTERESTS |
PORTLAND DISTRICT | DATE: | 07/26/2022 | NOTICE NUMBER: 201125 | ||||||
ATTN: CENWP-DE 333 SW FIRST AVE. - 10TH FLOOR PORTLAND OR 97204-3495 HTTP://WWW.NWP.USACE.ARMY.MIL/ |
POC: |
Hydroelectric Power Operations Manager John Day / Willow Creek Project Scott.M.Green@usace.army.mil (541) 739-1051 |
LOCAL NUMBER: 22-10 WATERWAY: COLUMBIA RIVER EFFECTIVE: 07/26/2022 16:26 thru UNTIL FURTHER NOTICE |
________________________________________________________________________________________________________________________ | |||||||||
John Day Navlock Open in Reduced Capacity | |||||||||
John Day Navigation Lock is operational in a reduced capacity. A bulkhead is being used in place of the upstream gate, which will result in lockages that take approximately 3 hours each. Working on procuring replacement parts for the upstream gate.
|
|||||||||
//signed// Casey ODonnell Technical Manager for Navigation Portland District, USACE |